Installation & commissioning
A machine that is installed is not the same as a machine that is producing. We hand over on the second one.
What is included
- Positioning, levelling and anchoring to your floor
- Power, air and water connection to the machine's requirement
- First run, settings and sample production
- Handover to your operators, with the settings recorded
Common questions
- How long does commissioning take?
- It depends on the machine and on how ready the site is. The variable is almost never the machine — it is whether power, air and floor are prepared to specification before we arrive. We will tell you exactly what to have ready.
- Do you install machines we bought elsewhere?
- Yes. We commission machines regardless of where they were purchased, including used machines bought at auction or directly from another mill.
- What do you need from us before the date?
- Floor plan and available space, power supply details, compressed air availability and pressure, and the machine documentation if you have it. If you do not have the documentation, send us a photograph of the nameplate.